14:08:13 EDT Thu 25 Apr 2024
Enter Symbol
or Name
USA
CA



Sierra Metals Inc
Symbol SMT
Shares Issued 159,642,009
Close 2015-01-26 C$ 1.40
Market Cap C$ 223,498,813
Recent Sedar Documents

Sierra Metals produces 3.14 million oz Ag in 2014

2015-01-27 07:20 ET - News Release

Ms. Audra Walsh reports

SIERRA METALS REPORTS RECORD SILVER AND COPPER PRODUCTION IN FOURTH QUARTER 2014 AND ANNOUNCES 2015 PRODUCTION OUTLOOK

Sierra Metals Inc. has released production results for the fourth quarter and year ended Dec. 31, 2014, from its three underground mines in Latin America: the Yauricocha polymetallic mine in Peru, and the Bolivar copper and Cusi silver mines in Mexico.

Fourth-quarter production highlights:

  • Total tonnes processed of 428,859; a 10-per-cent increase over the fourth quarter of 2013;
  • Silver production of 875,400 ounces; a 34-per-cent increase over the fourth quarter of 2013;
  • Copper production of 5.9 million pounds; a 23-per-cent increase over the fourth quarter of 2013;
  • Lead production of 12.1 million pounds; a 7-per-cent increase over the fourth quarter of 2013;
  • Zinc production of 13.4 million pounds; consistent with the fourth quarter of 2013;
  • Gold production of 2,329 ounces; a 40-per-cent increase over the fourth quarter of 2013.

Production highlights from 2014:

  • Total tonnes processed of 1,706,715; a 29-per-cent increase over 2013;
  • Silver production of 3,148,145 ounces; a 23-per-cent increase over 2013;
  • Copper production of 22.6 million pounds; a 42-per-cent increase over 2013;
  • Lead production of 48.8 million pounds; a 29-per-cent increase over 2013;
  • Zinc production of 54.3 million pounds; a 5-per-cent increase over 2013;
  • Gold production of 9,457 ounces; a 40-per-cent increase over 2013.

Production guidance for 2015:

  • Silver: 3,144,000 ounces to 3,668,000 ounces;
  • Copper: 21.0 million pounds to 24.3 million pound;
  • Lead: 44.3 million pounds to 51.8 million pounds;
  • Zinc: 41.9 million pounds to 48.9 million pounds;
  • Gold: 11,200 ounces to 13,000 ounces.

Audra Walsh, president and chief executive officer of Sierra Metals, commented: "Two thousand fourteen was another record year of metal production driven by organic growth in our three mines. The company's metal production exceeded the high end of the guidance for silver, gold, lead and zinc while copper production was within the guidance range. Our Q4 2014 production of 875,400 silver ounces was the highest quarter in the history of the company, as was the ore throughput. The management team remains focused on executing opportunities to further increase production and reduce costs in 2015, which we anticipate will help offset the impact of depressed metal prices. The quality of our assets will enable us to continue delivering solid production results during 2015."

Mine operations

The total tonnes of ore processed of 1,706,715 in 2014 compared with 1,321,781 in 2013 was a 29-per-cent increase year over year. The success of increasing consolidated metal production in 2014 was assisted by higher throughput at all three mines, Bolivar (76 per cent), Cusi (45 per cent) and Yauricocha (6 per cent).

                                                                       
                                       CONSOLIDATED PRODUCTION   

                                Three months ended                   12 months ended
                          Dec. 31, 2014  Dec. 31, 2013        Dec. 31, 2014  Dec. 31, 2013

Tonnes processed                428,859        390,781            1,706,715      1,321,781
Daily throughput                  4,901          4,466                4,892          3,776
Silver production (oz)          875,400        653,705            3,148,145      2,560,467
Copper production (000 lb)        5,908          4,819               22,643         15,905
Lead production (000 lb)         12,096         11,278               48,834         37,957
Zinc production (000 lb)         13,399         13,382               54,256         51,747
Gold production (oz)              2,329          1,665                9,457          6,736

Yauricocha mine, Peru

The Yauricocha mine continued to be the company's largest producing mine with a total of 224,986 tonnes processed in the fourth quarter of 2014 representing a 5-per-cent increase compared with 214,454 tonnes in the fourth quarter of 2013. Total annual tonnes processed of 885,495 in 2014 compared with 837,496 tonnes in 2013 resulted in a 6-per-cent increase year over year. Mineralization at the Yauricocha mine is hosted in three different zones, including lead-oxide, copper-oxide and polymetallic orebodies.

During the fourth quarter of 2014, total production of these orebodies was 595,340 ounces of silver, a 28-per-cent increase year over year; 2.3 million pounds of copper, a 97-per-cent increase year over year; 11.6 million pounds of lead, a 6-per-cent increase year over year; 13.4 million pounds of zinc, consistent year over year; and 1,360 ounces of gold, an 18-per-cent decrease year over year. Higher metal production was mainly driven by an increase in the polymetallic and copper oxide throughput and by higher lead and copper head grades, and higher silver and lead recoveries. Increase in production was partially offset by lower head grades in the lead-oxide body in line with Yauricocha's mine plan.

                                                                                  
                               YAURICOCHA PRODUCTION     

                       Three months ended Dec. 31, 12 months ended Dec. 31,
                                 2014        2013         2014        2013

Tonnes processed              224,986     214,454      885,495     837,496
Daily throughput                2,571       2,451        2,545       2,393
Polymetalic (tonnes)          178,300     164,664      703,713     641,268
Silver grade (g/t)              94.28       73.53        83.77       83.20
Copper grade                    0.80%       0.49%        0.70%       0.65%
Lead grade                      1.91%       1.60%        1.79%       1.48%
Zinc grade                      3.87%       4.09%        3.95%       4.05%
Gold grade (g/t)                 0.63        0.63         0.66        0.67
Silver recovery                 79.9%       72.5%        76.5%       70.4%
Copper recovery                 68.6%       65.1%        68.0%       70.6%
Lead recovery                   85.8%       81.8%        83.9%       80.0%
Zinc recovery                   88.1%       90.0%        88.5%       88.7%
Gold recovery                   15.2%       14.1%        14.0%       16.6%
Lead oxides (tonnes)           40,572      49,789      171,829     196,228
Silver grade (g/t)             217.98      268.79       233.70      277.81
Lead grade                      8.28%       8.87%        9.00%       7.71%
Gold grade (g/t)                 1.09        1.65         1.27        1.71
Ag recovery                     53.9%       42.2%        50.7%       37.6%
Pb recovery                     68.3%       63.8%        67.9%       61.0%
Gold recovery                   53.1%       45.1%        49.9%       41.1%
Copper oxides (tonnes)          6,114           0        9,953           0
Silver grade (g/t)             101.51        0.0%        91.81        0.0%
Copper grade                    2.76%       0.00%        3.10%       0.00%
Lead grade                      3.13%       0.00%        3.05%       0.00%
Gold grade (g/t)                 0.59           0         0.54           0
Ag recovery                     53.0%        0.0%        50.4%        0.0%
Cu recovery                     43.1%        0.0%        36.6%        0.0%
Pb recovery                     30.3%        0.0%        31.5%        0.0%
Gold recovery                   45.0%        0.0%        45.4%        0.0%
Silver production (oz)        595,340     463,964    2,121,565   1,866,769
Copper production (000 lb)      2,304       1,167        7,697       6,514
Lead production (000 lb)       11,632      10,956       46,714      37,055
Zinc production (000 lb)       13,399      13,382       54,256      50,817
Gold production (oz)            1,360       1,665        5,683       6,736

Bolivar mine, Mexico

During the fourth quarter of 2014, total ore processed at the Bolivar mine increased 5 per cent with 159,904 tonnes processed compared with 152,242 tonnes in the fourth quarter of 2013. Total annual tonnes processed of 665,951 in 2014 compared with 377,432 tonnes in 2013 resulted in a 76-per-cent increase year over year. Copper production during the fourth quarter of 2014 decreased by 1 per cent with a total of 3.6 million pounds produced (compared with 3.7 million pounds in the fourth quarter 2013). Silver production at Bolivar in the fourth quarter of 2014 increased 3 per cent year over year with a total of 92,689 ounces produced (compared with 90,013 ounces in the fourth quarter of 2013). This slight increase in production was driven by higher throughput compared with the fourth quarter of 2013.

                           BOLIVAR PRODUCTION

                                   Three months            12 months 
                                  ended Dec. 31,         ended Dec. 31,
                                2014        2013        2014        2013

Tonnes processed             159,904     152,242     665,951     377,432
Daily throughput               1,827       1,740       1,903       1,078
Copper grade                   1.25%       1.27%       1.22%       1.30%
Zinc grade                     0.17%       0.33%       0.21%       0.47%
Silver grade (g/t)             22.03       21.59       22.54       25.87
Gold grade (g/t)                0.29        0.00        0.23        0.00
Copper recovery               82.10%      85.44%      83.28%      86.53%
Zinc recovery                  0.00%       0.00%       0.00%      23.66%
Silver recovery               81.85%      85.19%      82.15%      86.21%
Gold recovery                 45.32%       0.00%      49.38%       0.00%
Copper production (000 lb)     3,604       3,652      14,946       9,391
Zinc production (000 lb)           0           0           0         930
Silver production (oz)        92,689      90,013     396,421     270,610
Gold production (oz)             665           0       2,485           0

Cusi mine, Mexico

During the fourth quarter of 2014 total ore processed increased 83 per cent with a total of 43,969 tonnes of ore processed (compared with 24,085 tonnes in the fourth quarter of 2013). Total annual tonnes processed of 155,269 in 2014 compared with 106,853 tonnes in 2013 resulted in a 45-per-cent increase year over year. During the fourth quarter of 2014 production of silver at Cusi increased 88 per cent with a total of 187,371 ounces of silver (compared with 99,727 ounces in the fourth quarter of 2013).

                            CUSI PRODUCTION         

                                 Three months              12 months 
                                ended Dec. 31,           ended Dec. 31,
                              2014        2013          2014        2013

Tonnes processed            43,969      24,085       155,269     106,853
Daily throughput               503         275           444         305
Silver grade (g/t)          173.13      166.15        166.69      166.65
Gold grade (g/t)              0.33        0.00          0.42        0.00
Lead grade                   0.62%       0.78%         0.78%       0.55%
Silver recovery             76.56%      77.44%        75.70%      73.83%
Gold recovery               66.08%       0.00%        61.89%       0.00%
Lead recovery               77.06%      77.94%        79.06%      69.23%
Silver production (oz)     187,371      99,727       630,159     423,089
Gold production (oz)           304           0         1,289           0
Lead production (000 lb)       464         323         2,120         902

Quality control

The technical content of this news release has been approved by Dr. Thomas L. Robyn, PhD, CPG, RPG, a qualified person as defined in National Instrument 43-101.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.