Red Eagle Mining Corp. has provided an update on operations at the Santa Rosa gold project, Antioquia, Colombia. The mill ran at 727 tonnes per day, processing 22,549 tonnes at 3.89 grams per tonne gold producing 2,651 ounces of gold in March.
San Ramon currently has 21 active attack ramps with 17 in production (which provided 44 active ore production faces in March) and the remaining attack ramps in breasting and backfill. Stope mining operations continued to ramp up with 614 tonnes per day mined in March. With the arrival of the final scoops in April and development currently under way, five new attack ramps are expected to be completed by the end of May to begin ore production in high-grade areas to the west, to the east and at depth from existing production areas. These additional production faces will allow mining rates to continue to increase to 1,000 tonnes per day as planned with gold production steadily increasing throughout the second quarter.
Total January February March Total Q1
Ore mined (tonnes) 12,497 17,092 19,027 48,616
Ore processed (tonnes) 17,008 21,138 22,549 60,695
Processed gold grade (g/t Au) 2.12 3.19 3.89 3.15
Gold produced (ounces) 1,100 1,974 2,651 5,725
Recovery (%) 95% 91% 94% 93%
Average per day
Ore mined (tonnes) 417 610 614 540
Ore processed (tonnes) 567 755 727 682
About Red Eagle Mining Corp.
Red Eagle Mining is a gold producer focused on building shareholder value through acquiring, developing and operating gold and silver projects in Colombia, a jurisdiction with prolific historic production but until recently limited modern exploration. Red Eagle Mining owns 100 per cent of the Santa Rosa gold project and controls Red Eagle Exploration, which owns 100 per cent of the Vetas gold, California gold and Santa Ana silver projects.