Mr. Warren Bates reports
PELANGIO HITS HIGH GRADE-11.94 G/T GOLD OVER 10 METRES-AT POKUKROM EAST ON MANFO PROPERTY
Pelangio Exploration Inc. has released results from seven additional diamond drill holes totalling 1,574 metres on the Manfo property in Ghana.
Highlights --
Pokukrom East gold zone
- 1.19 grams per tonne (g/t) gold over 113 metres (or 1.15 g/t gold, cut
to 30 g/t) in SPDD-184 from 131 metres downhole, including 9.05 g/t
gold over seven metres (or 8.36 g/t gold, cut to 30 g/t);
- 2.6 g/t gold over 64 metres (or 2.36 g/t gold, cut to 30 g/t) in SPDD-188 from 96 metres downhole, including 11.94 g/t gold over 10 metres
(or 10.46 g/t gold cut to 30 g/t);
- 16.72 g/t gold over four metres (or 13.5 g/t gold, cut to 30 g/t) in SPDD-192 from 49 metres downhole;
- Higher-grade, shallow, north-plunging core of Pokukrom East zone now
recognized from Section 49350 to Section 49900 with an open plunge of 600 metres
from near surface in SPDD-088 (7.01 g/t gold over 19 metres) to 210
metres depth in SPDD-184.
"Drill holes SPDD-184 and SPDD-188 are our best holes on the Manfo property to date," stated Warren Bates, senior vice-president, exploration. "These holes represent the north-plunging core of higher-grade mineralization at Pokukrom East, now demonstrating an open-plunge length of 600 metres."
Geological setting
The accompanying table summarizes significant assay results reported herein.
Core
From To length Au Au (cut)
DHID (m) (m) (m)(1) (g/t) (g/t)(2)
SPDD-184 97 116 19 0.75
131 244 113 1.19 1.15
Including 215 222 7 9.05 8.36
SPDD-188 96 160 64 2.60 2.36
Including 136 146 10 11.94 10.46
SPDD-190 48 72 24 0.86
SPDD-192 49 53 4 16.72 13.50
59 82 23 1.41
Including 70 81 11 2.52
(1) Intervals are core length. Unless otherwise indicated, a cut-off
grade of 0.2 g/t gold was used in calculating intervals, with
allowance for up to five metres of internal dilution.
(2) High-grade intervals were cut to 30 g/t, as applicable.
The Pokukrom East geochemical anomaly is approximately 1,200 metres in length. To date, Pelangio has confirmed gold mineralization at Pokukrom East along 850 metres open at depth. Gold mineralization is generally associated with a sericite-pyrite-altered metagranitoid-hosted shear, with higher-grade zones associated with quartz-pyrite veining. Lower-grade mineralization occurs in hematite-altered metagranitoid, which is a peripheral alteration to the sericite-hosted gold mineralization. The results announced herein from Pokukrom East are step-back or infill holes on or between previously drilled sections.
SPDD-181, -182 and -184 were drilled on Section 49800, which had not previously been drilled. SPDD-184 intersected the main Pokukrom East zone at 140 metres depth, and included the longest mineralized intersection yet encountered at Manfo -- 1.19 g/t gold over 113 metres. The intersection also included 9.05 g/t gold over seven metres, which correlates well with a moderate- to higher-grade zone encountered within the main Pokukrom East bulk-tonnage zone, as shown in the accompanying table.
DHID Core length Au
(m) (g/t)
SPDD-088 19 7.01
SPDD-192 4 16.72
SPDD-106 13 3.47
SPDD-107 11 3.53
SPDD-085 13 3.37
SPDD-152 13 3.26
SPDD-188 10 11.94
SPDD-110 10 3.05
SPDD-157 7 2.58
SPDD-179 14 3.12
SPDD-186 9 3.74
SPDD-184 7 9.05
SPDD-127 13 2.25
SPDD-178 11 2.51
SPDD-180 14 2.50
The zone plunges to the north at approximately 40 degrees and has an open-plunge length of approximately 600 metres. Significantly, SPDD-179, -186, -184, -127 and -180 form the core of the down-plunge extent of the higher-grade mineralization across approximately 200 metres of strike at approximately 200-plus metres depth, which remains open and undrilled to date. The company intends to continue testing the down-plunge extent of this higher-grade zone to at least 300 metres depth.
SPDD-181 (0.31 g/t gold over 16 metres) and -182 (0.49 g/t gold over 29 metres) appear to have intersected the upper portion of the Pokukrom East bulk-tonnage zone.
SPDD-188 and -195 were drilled on Section 49600, which had not been previously drilled. SPDD-188 intersected 2.6 g/t gold over 64 metres, including the high-grade intersection noted above -- 11.94 g/t gold over 10 metres. SPDD-195 intersected a shallow portion of the Pokukrom East bulk-tonnage zone, intersecting 0.49 g/t gold over 49 metres, along with two anomalous zones within 28 metres from 82 metres.
SPDD-190 was drilled on Section 49500 as a step-back from SPDD-107 and -161. The hole intersected multiple zones of gold mineralization, including 0.86 g/t gold over 24 metres, in the hangingwall of the main zone. Lower-grade mineralization was encountered in two intersections deeper in the hole (0.38 g/t gold over 38 metres and 0.66 g/t gold over 18 metres) and probably represents a portion of the main zone on the section, or potentially the upper periphery of the zone intersected in SPDD-166 (2.24 g/t gold over 19 metres).
SPDD-192 was drilled on Section 49450 to follow up on the high-grade mineralization encountered on Section 49350 in SPDD-088 (7.01 g/t gold over 19 metres, including 24.68 g/t gold over five metres). The hole successfully intersected the high-grade zone, returning 16.72 g/t gold over four metres from 49 metres as well as an adjacent zone from 59 metres of 1.41 g/t gold over 23 metres, including 2.52 g/t gold over 11 metres.
Cross-sections illustrating the Pokukrom East drill holes and intersections discussed herein are available at the company's website.
Drilling progress and exploration outlook
Including the seven holes totalling 1,574 metres reported herein, Pelangio has completed 124 drill holes totalling 25,150 metres in its phase 2 program on the Manfo property, of which 94 drill holes have been reported. Further assay results will be released in due course.
Pelangio's exploration focus on the Manfo property is to identify near-surface, drill-ready targets through geochemical sampling and to test and extend such targets with drilling and geophysical surveying. The company's aim during 2012 is to prepare an initial resource estimate on the Manfo property while demonstrating the property's potential to host numerous other gold-bearing zones with resource potential.
Quality assurance/quality control and qualified person
The drill holes reported in this press release were drilled using HQ-sized (63.5 millimetres) and NQ-sized (47.6 millimetres) diamond drill bits. Company security is provided at the drill site. Contractors working for Pelangio conducted all logging and sampling. The core was logged, marked up for sampling using standard lengths of one metre, then divided into equal halves using a diamond saw. One-half of the core was left in the original core box and stored in a secure location at the Pelangio compound in Tepa, Ghana. The other half was sampled, placed into sealed bags and securely stored at the site until it was shipped to the ALS Chemex laboratory in Kumasi, Ghana. The core was dried and crushed by ALS Chemex, and a 150-gram pulp was prepared from the coarse crushed material. ALS Chemex conducted routine gold analysis using a 50-gram charge and fire assaying with atomic absorption finish. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream at the rate of one per every 20 samples. In addition, ALS Chemex inserted one preparation blank and a certified reference sample in for every 20 samples, and ran one duplicate analysis every 20 samples.
The exploration program at the Manfo property is overseen by Warren Bates, PGeo (Ontario), a qualified person within the meaning of National Instrument 43-101. Mr. Bates has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information.
MANFO GOLD PROJECT --
DRILL RESULTS (POKUKROM EAST ZONE)
Core
From To length Au
DHID (m) (m) (m)(1) (g/t)
SPDD-181 57 73 16 0.31
SPDD-182 32 61 29 0.49
SPDD-184 97 116 19 0.75
131 244 113 1.19
113 1.15
Including 215 222 7 9.05
7 8.36
SPDD-188 29 50 21 0.26
69 90 21 0.53
96 160 64 2.60
64 2.36
Including 136 146 10 11.94
10 10.46
SPDD-190 48 72 24 0.86
174 211 37 0.38
222 240 18 0.66
SPDD-192 49 53 4 16.72
4 13.50
59 82 23 1.41
Including 70 81 11 2.52
SPDD-195 25 74 49 0.49
(1) Intervals are core length. At Pokukrom East,
true width of holes drilled at minus 45
degrees and minus 50 degrees is estimated to
be approximately core length, while true
width of holes drilled at minus 65 degrees
and minus 70 degrees is estimated to be
approximately 90 per cent of core length.
We seek Safe Harbor.
© 2024 Canjex Publishing Ltd. All rights reserved.