Mr. Phillip Walford reports
NEW HIGH-GRADE GOLD ZONES IN THE SOUTHWEST MARATHON DEPOSIT: 17.39 G/T AU OVER 5.0 M, 19.63 G/T AU OVER 3.0 M & 4.90 G/T AU OVER 13.0 M, VALENTINE LAKE GOLD CAMP, NEWFOUNDLAND
Marathon Gold Corp. is excited by its continued success in predicting and intersecting high-grade gold mineralization at open-pit depths in the southwestern part of the Marathon deposit. Drill holes MA-18-336 to MA-18-339, MA-18-341, MA-18-343 and extended drill hole MA-17-216 all succeeded in intersecting significant intervals of good gold grades as the company continues to further define the main mineralized corridor in this southwestern part of the Marathon deposit, focusing on widening the shallow open-pit resources and decreasing strip ratio.
"We are pleased to be announcing these encouraging drilling results from the later stages of our 2018 drilling program," said Phillip Walford, president and chief executive officer of Marathon Gold. "We continue to intersect high-grade gold over wide intervals at open-pit depths which will be added to a resource update for the prefeasibility study. Two thousand eighteen has been a very productive year at Valentine Lake. We have added 844,000 ounces of measured and indicated and 519,000 ounces inferred of gold to the total overall resources this year through some very challenging gold markets. As this year comes to a close, we look forward to a better gold market in 2019 as we continue to grow the largest gold deposit in Atlantic Canada."
SIGNIFICANT ASSAY INTERVALS, MARATHON DEPOSIT, VALENTINE LAKE GOLD CAMP
DDH From To Core length True thickness Gold Gold (cut)*
(m) (m) (m) (m) (g/t) (g/t)
MA-18-336 158 167 9 7.7 4.96
including 164 166 2 1.7 18.21
217 230 13 11.1 2.38
including 227 229 2 1.7 6.36
241 244 3 2.6 1.50
267 270 3 2.6 1.38
276 279 3 2.6 3.12
MA-18-337 25 28 3 2.9 2.27
134 138 4 3.8 1.29
188 191 3 2.9 3.18
193 206 13 12.4 4.90 4.77
including 200 202 2 1.9 24.49 23.61
MA-18-338 12 15 3 2.6 6.54
111 116 5 4.3 2.32
MA-18-339 100 103 3 2.9 4.13
110 113 3 2.9 2.20
124 127 3 2.9 4.86
MA-18-341 36 40 4 3.0 1.71
67 70 3 2.3 19.63 15.95
including 68 69 1 0.8 56.04 45.00
MA-18-343 40 43 3 2.9 1.00
93 96 3 2.9 1.44
101 104 3 2.9 1.46
171 174 3 2.9 1.31
213 218 5 4.8 17.39 10.45
including 213 215 2 1.9 42.76 25.42
MA-17-216 Ext 252 264 12 9.6 2.28
including 258 260 2 1.6 7.63
306 309 3 2.4 6.59
484 487 3 2.4 2.98
* No significant intervals in MA-18-340, 342, FA analysis cut to 45.0 g/t Au.
Acknowledgments
Marathon acknowledges the financial support of the junior exploration assistance program, Department of Natural Resources, government of Newfoundland and Labrador.
Quality assurance/quality control
Sherry Dunsworth, MSc, PGeo, senior vice-president of exploration, Marathon's qualified person, has reviewed the contents for accuracy and has approved this press release on behalf of Marathon. Thorough QA/QC protocols are followed including the insertion of blanks and standards at regular intervals in each sample batch. Drill core is cut in half with one-half retained at site, the other half tagged and sent to Eastern Analytical Ltd. in Springdale, Nfld. All reported core samples are analyzed for Au by fire assay (30 g) with AA finish. All samples above 0.10 g/t Au in economically interesting intervals are further assayed using metallic screen to mitigate the presence of coarse gold. Significant mineralized intervals are reported in the table as core lengths and estimated true thickness (70 to 95 per cent of core length).
About Marathon Gold Corp.
Marathon is a Toronto-based gold exploration company rapidly advancing its 100-per-cent-owned Valentine Lake gold camp located in Newfoundland, one of the top mining jurisdictions in the world. The Valentine Lake gold camp currently hosts four near-surface, mainly pit-shell constrained, deposits with measured and indicated resources totalling 2,691,400 ounces of gold at 1.85 grams per tonne and inferred resources totalling 1,531,600 ounces of gold at 1.77 g/t.
We seek Safe Harbor.
© 2024 Canjex Publishing Ltd. All rights reserved.