09:14:14 EDT Sat 20 Apr 2024
Enter Symbol
or Name
USA
CA



Bonterra Resources Inc (3)
Symbol BTR
Shares Issued 43,131,385
Close 2019-03-01 C$ 2.05
Market Cap C$ 88,419,339
Recent Sedar Documents

Bonterra drills 1.3 m of 157.6 g/t Au at Barry

2019-03-04 08:15 ET - News Release

Mr. Greg Gibson reports

UNDERGROUND DRILLING CONFIRMS MULTIPLE GOLD ZONES AT BARRY - INTERSECTS 157.6 G/T AU OVER 1.3 METRES

Bonterra Resources Inc. has provided results from its recently completed underground drilling campaign at the Barry project, with new high-grade gold mineralization intersections in various zones.

Drilling highlights include:

  • 13.4 grams per tonne Au over 3.2 metres in hole BR18-03;
  • 8.2 g/t Au over 5.3 metres in hole BR18-05;
  • 15.4 g/t Au over 2.3 metres in hole BR18-08;
  • 157.6 g/t Au over 1.3 metres in hole BR18-12B;
  • 15.5 g/t Au over 4.5 metres in hole BR19-25.

These results are from Bonterra's diamond drilling campaign undertaken on the Barry deposit during Q4 2018 and Q1 2019. The program consisted of 25 subhorizontal drill holes totalling 7,548 metres. This campaign was successful in confirming the multiple gold zones utilizing 20- to 30-metre drill spacings, mainly on level 100. Most of the drill holes intersected gold mineralization where it was anticipated based on the company's current models.

Greg Gibson, interim chief executive officer, states: "We are extremely pleased with our recent underground drilling campaign at Barry which has proven to be a large success, attesting to the robust continuity and grade of the deposit. This new drilling data on the Barry deposit will be included in the upcoming property-wide resource estimate."

The definition drilling campaign validates the location and grade of the gold-bearing zones at Barry and will allow for the planning of a proposed bulk sample in the upcoming months. The company also intends to increase the size of the Barry deposit by drill testing multiple mineralized shears and tensional veins that remain open at depth along strike and down dip.

The gold mineralization at the Barry project is structurally controlled and is hosted in a sheared basalt containing quartz-carbonate-albite veins with pyrite. Bonterra has identified five main subvertical and subparallel shear zones, and approximately 10 secondary more shallow-dipping tension veins. These structures are open in all directions.

                                  DRILLING HIGHLIGHTS
    
Hole              From (m)          To (m)     Length* (m)     Grade (g/t)           Zone

BR18-01             283.6           286.0             2.4             9.9             800
BR18-03             285.7           286.7             1.0            17.9             800
                    307.4           310.6             3.2            13.4              H3
BR18-05             206.9           208.2             1.3             7.8              H7
                    278.2           283.4             5.2             8.2             800
BR18-07             291.5           296.0             4.5             4.8             800
BR18-10             296.6           299.0             2.4            12.5             800
                    330.5           331.5             1.0             7.3              H3
BR18-08             246.4           248.2             1.8             8.4              H7
                    292.3           296.2             3.9             3.0             800
                    343.9           346.2             2.3            15.4              H3
BR18-09             168.5           172.2             3.7             4.6             950
                    253.3           254.3             1.0            12.3              H7
BR18-11              77.7            79.2             1.5            16.5            1000
                    297.6           303.4             5.8             2.0             800
                    334.6           336.5             1.9            10.8              H3
BR18-12             220.7           222.2             1.5             8.6              H7
BR18-12B            213.0           214.9             1.9             4.1              H7
                    224.5           226.0             1.5             3.6              H7
                    231.1           232.4             1.3           157.6             850
                    290.0           291.2             1.2             7.8             800
BR18-18             121.8           123.4             1.6             6.2             950
                    151.9           153.3             1.4             1.6             950
BR18-21             143.0           144.1             1.1             5.2             950
                    305.0           310.1             5.1             4.1              H3
BR19-24A            280.5           282.2             1.7             7.6              H7
                    287.5           291.5             4.0            10.1              H7
                    296.5           300.6             4.1             4.8              H7
                    344.7           349.0             4.3             2.2             800
BR19-25             194.8           199.3             4.5            15.5              H7
                    263.4           264.5             1.1             7.4             800

* Stated lengths are core width as drilled, true widths vary and average between 75 and 
  90 per cent of drilled widths.


  

Quality control and reporting protocols

The company uses a rigorous quality assurance/quality control analytical program according to industry standards. The analytical results were done by pyroanalysis (AA) at the mine laboratory. Blanks, duplicates and certified reference standards are inserted into the sample stream to monitor laboratory performance. The company's QA/QC analytical verification program requires that a minimum of 10 per cent of the samples be audited at an independent laboratory. These audit assays were sent to ALS laboratory located in Val d'Or, Que. The results of the audits are consistent with those obtained.

Qualified person

Pascal Hamelin, PEng, vice-president of operations, is the qualified person under NI 43-101, responsible for reviewing and approving the technical information contained in this news release.

We seek Safe Harbor.

© 2024 Canjex Publishing Ltd. All rights reserved.